Cambs Home | CRW Home | Parishes Home
Now with a Morelock installed at the Zebra Crossing
2025 @ Zebra Crossing

CRW Director Andy Smith (right) Handing over Control of the MGL
SID to the Village SST
(for battery changes & Data downloads)
MGL Westcotec SID Installed (by Village
Team) 1 Sep 24
as a Trial until 19 Oct 24
To determine if a SID would make a difference - and IT DOES !!
2025 ACTIVITIES
MGL SID Reports for OB Traffic at Sennett Way
4 weeks in April (Over Easter)
MGL SID Reports for OB Traffic at Read St
-----------------------------------------------------------------------------------------------------------------
2024 ACTIVITIES
Data from 23 Sep to 6 Oct (2 Weeks) HERE
Data from 16-23 Sept HERE
Data from 2-16 Sept HERE
Data from it 1-7th Sept
HERE
(See Logger Results for comparison below)

Logger being installed by CRW in March 2024
Bi-Directional Logger Report To/From Zebra Crossing 22-30 March
Westcotec SID Moved on 19th Oct 2024to Display to Outbound Traffic Ahead of the High St junction

FINAL Data From That Location for 56 days 19 Oct-14 Dec
Data From That Location 2-8 Dec
Data from that Location 25 Nov-1 Dec
Data from that Location 11-18 Nov
Data from that Location 4-10 Nov

CRW Installing the MGL Data Logger in March 2024
2024 ACTIVITIES
MGL SID Report for OUTBOUND Traffic at Read St 14 Dec 24 - 18 Jan 25
Bi-Directional Logger Report To/From Read St 22-30 March
2024 SPEEDWATCH WAS SUCCESSFULLY SET
UP
(Thanks to CRW for providing the Flyer to initiate the survey)
Contact the Parish Clerk to Join in

(Click on above Flyer for the Village Survey Form & Return to Parish
Rooms asap
© These data / reports are not for official use or general distribution
for any official purpose ©
without the permission of MD CRW(UK) CIC